July 18, 2015 August 3, 2015 admin General, Inventory Control, mrp MD04, MRP, SAP Help, SAP MRP The next series of posts will look at material requirements and the process I use to ensure we have all materials required for production. Stock requirements list md04 • 1. Stock RequirementsListby MK Moon Page 1 • Overview•Stock requirements list unlike MRP list is a dynamic report giving up-to-dateinformation about new requirements of that material, such as Planned IndependentRequirements (PIRs), Issue Stock Transfer order, Sales orders and so on.•A stock requirements list is the most up-to-date report of a given material/ materials.•Whenever there is a receipt or issue added to the material, the same is updated instock requirements list on a real-time basis. Page 2 • Different between MRP List • The main difference between the MRP list and the stock/requirements list is that each time the stock/requirements list is called, the system selects the MRP elements and displays the most up-to-date situation. • You thus always see the current availability situation of the material in the stock/requirements list. • Changes that are made after the planning date are displayed directly, so the list is therefore dynamic. Page 3 • Planned Independent Requirement(PIR)• Planned independent requirements are used to perform Demand Management functions.• These are planned production or sales quantities that are based on forecast procedure (for example, Material Forecast or S&OP procedure).• These numbers are used in MRP to calculate procurement and/or production quantities for a material.• A planned independent requirement contains one planned quantity and one date, or a number of planned independent requirements schedule lines, that is, one planned quantity split over time according to dates. ![]() MD04 MD05 MD06 MD07 Differences MD04 MD05 MD06 MD07 Differences Some information for their differences: MD04 - MRP Display Stock Requirements List MD04 provides a display of the existing, immediate availability of a single material within a plant. The display will show on hand inventory, open requisitions, open purchase orders, open stock transport orders and reservations made against a material. Every time the list is displayed or refreshed, it will update with the most current information. MD05 - Individual Display of MRP List MD05 provides a snap shot of the condition of a single material within a plant as of the last time MRP was run. Step 4: Now your computer will search for all nearby devices, once you see the name of your printer, click on it. Step 5: Now a configuration window will appear in front of you, read the given options and select a method of configuration and click on Next. Note: Always Select Recommended settings. Step 3: In the Control Panel section you will find numerous categories, select 'Add a hardware/Printer device'. Step 6: Complete the setup by following simple on-screen instructions and complete the setup. Canon mp210 printer driver free download. The display will show on hand inventory, open requisitions, open purchase orders, open stock transport orders and reservations made against a material. MD06 - Collective Display of MRP list MD06 provides a collective list of all materials run during the MRP process. Parameters may be set to view certain criteria across all materials. The same detailed information detailed in MD05 may also be obtained by using the drill-down features. MD07 - Stock Requirements Collective Display MD07 provides a collective list of all materials within a plant. Parameters may be set to view certain criteria across all materials. The same detailed information provided in MD04 may also be obtained by using the drill-down features. In Summary: 1. MD05 and MD06 is related. MD05 display single, MD06 display collective. – This 2 display the Last MRP run result. MD04 and MD07 is related. MD04 display single, MD07 display collective. – This 2 display the “real time” stock requirement result. Example of differences: Plant: P100 Material: CTESTMAT1 Run MD04 and MD07 you will be able to see: 1. Sales order – Qty -20 2. Purchase order – Qty +30 Run MD05 and MD06 you won’t see it because this 2 orders were created after I run the MRP. See also Get help for your SAP PP Problems SAP Books SAP PP Tips Main Index All the site contents are Copyright © www.erpgreat.com and the content authors. All rights reserved. All product names are trademarks of their respective companies. The site www.erpgreat.com is in no way affiliated with SAP AG. Every effort is made to ensure the content integrity. Information used on this site is at your own risk. The content on this site may not be reproduced or redistributed without the express written permission of www.erpgreat.com or the content authors.
0 Comments
Leave a Reply. |